Week 15, day 5: The penultimate Friday
15th August 2014
A day with the plasterers only today, as the builders couldn't make it.
Photos 1-4: The ceilings in the en suite bathroom, main bathroom and landing were plastered today.




Photo 5: They also boarded up the mess that was above the window in the library, ready to plaster next week.

Photo 6: The floor in the utility room was finally finished today, with the boards going on top of the joists and being screwed in place. It is lovely and level now, and the toilet and washing machine are very happy in their new home.

Photos 1-4: The ceilings in the en suite bathroom, main bathroom and landing were plastered today.




Photo 5: They also boarded up the mess that was above the window in the library, ready to plaster next week.

Photo 6: The floor in the utility room was finally finished today, with the boards going on top of the joists and being screwed in place. It is lovely and level now, and the toilet and washing machine are very happy in their new home.